关于”混凝土“的英语作文范文5篇,作文题目:concrete。以下是关于混凝土的雅思英语范文,每篇作文均为真题范文带翻译。
高分英语作文1:concrete
For example, the nuclear fuel elements used in the reactor gas filling process, such as the nuclear fuel tube, are used to control the operation of the reactor fuel_ Reaction_ Apparatus_ Contains_ In_ 1_ Pieces_ Pressure_ Container_ Inside_ , _ Around_ Yes_ 1_ Pieces_ Concrete_ Shielding_ Layer_ , _ Hot gas_ Through_ Pipeline_ Inflow_ Change_ Heat_ Apparatus_ , _ Change_ Heat_ Apparatus_ Medium_ Of_ Concrete_ Radiation_ Shielding_ Layer_ Outside_ , _ Steam_ In_ 2_ Times_ Loop_ Medium_ Generation_ , _ Pipeline_ Will_ Water_ Introduction_ , _ Water_ By_ Heating_ For_ Steam_ , _ And then_ Flow out_ At the same time, the hot gas sinks to the bottom of the heat exchanger, which is pushed into the cold gas pipe by a blower and returns to the reactor. This is a continuous cycle, which prevents the reactor from overheating and simultaneously takes away heat and steam to power the turbine.
中文翻译:
任务使用气冷核反应堆生产蒸汽例如,气冷核反应堆如何工作的过程包括反应堆本身和热交换器反应堆包含铀燃料元件,这些元件被石墨慢化剂包围,顶部是装填燃料元件的装料管和硼控制棒整个_反应_器_包含_在_一_个_压力_容器_内_ , _周围_有_一_个_混凝土_屏蔽_层_ , _热气_通过_管道_流入_换_热_器_ , _换_热_器_中_的_混凝土_辐射_屏蔽_层_外_ , _蒸汽_在_二_次_回路_中_产生_ , _管道_将_水_引入_ , _水_被_加热_为_蒸汽_ , _然后_流出_ 。_同时,热气体下沉到换热器的底部,通过一个吹风机将其推入冷气体管道并返回反应堆,这是一个连续的循环,防止反应堆过热,同时带走热量和蒸汽,为涡轮机提供动力。
万能作文模板2:混凝土
Dear captain: I live in the cell next door. Recently, you are pouring concrete day and night. The lights are bright and the noise is very loud, which has affected our normal rest office workers.
Please take care of it. Don't occupy people's time because of the tight time and affect our normal daily life.
中文翻译:
亲爱的队长:我活着在隔壁的牢房里,最近你正在没日没夜地浇筑混凝土,灯火通明,噪音很大,影响了我们正常休息的上班族,请你管一管,不要因为时间紧,占用了人们的时间,影响了我们正常的日常生活。
满分英语范文3:混凝土
The construction site and its surroundings shall be kept clean and tidy. The ground shall be cleaned immediately after the work is finished, and the construction site shall be cleaned immediately after the completion of the project. Debris and concrete on the floor and stairs should be removed in time.
中文翻译:
施工现场及其周围应保持干净整洁,工作结束后应立即清理地面,并在工程完工后立即清理工地。地板和楼梯上的杂物和混凝土应及时清除。
本文网址: https://yyzw.hanshaobo.com/article/aora21ne.html
评论列表 (0)